BOWLING GREEN – The expected traffic impacts in the Kentucky Transportation Cabinet District 3 area for October 20 through October 27 are listed below. All work is subject to change.
Allen County
- KY 100 (8.8 to 14.8) – Crews will be working on shoulder areas. Please use caution while crews are working in these areas.
Barren County
- KY 90 – Paving will continue from KY 839 to the Metcalfe County line. Traffic has been switched to the new alignment, but a lot of work remains. Motorists should slow down and use caution in this area.
- KY 249 (mile point 5 to 11) – Resurfacing is expected to continue in this area. Motorists should expect lane closures.
Monroe County
- KY 678 (mile point 15.7)- A culvert replacement project will close the road in this at this location. The closure is expected to last two weeks. Motorists should seek an alternate route.
- KY 1366 (mile point 5.6) – The road remains closed as work continues on a culvert replacement. The road is estimated to reopen by Friday afternoon.
Todd County
- U.S. 79 (Mile point 7.5 to 7.7) – The project at the bridge over Elk Fork Creek continues. One-lane traffic with temporary traffic signal should be expected. A width restriction of 11’ is in place. The project will take several months to complete.
- U.S. 79 (Mile point 1.5 to 2.7) – Paving operations for the new alignment of U.S. 79 from KY 346 continues. Motorists should expect one-lane traffic with flaggers.
- KY 102 (mile point 7.8 to 9.4) – Motorists should expect delays and one-lane traffic while crews complete resurfacing.
- KY 2628 (mile point 0.0 to 3) – Motorists should expect delays and one-lane traffic while crews complete resurfacing.
Warren County
- KY 1083 (mile point 0.0 to 4) – A project to resurface and improve drainage on this section of KY 1083 is expected to continue. Motorists should expect lane closures from 6 a.m. to 6 p.m. for the next several weeks.